Rear Extension & Internal Remodel

Project Details

Client Type: Private Client

Location: Brixton, London

Duration: 26 weeks

Completion: September 2026

Key Challenge: Underpinning the existing building and reducing the ground in the new kitchen area to allow a step-down design

How We Overcame That Challenge: Removed walls to allow for a digger to enter the building and set up conveyor belts throughout the house to enable fast spoil removal.

Stand Out Features:

Polished concrete flooring

Extra tall crittall doors

Bespoke German-made kitchen

High-quality appliances

Exposed finishes (Timber joists & Steels)

Architect: BAS Architects

Structural Engineer: Croft Structural Engineers

QS/Cost Consultant: Turnkey Building Contractors